Wrexham Waste PFI
The PFI contract was a design and build of a new 50,000 tonnes per annum throughput Integrated Waste Management Facility ( IWMF) incorporating a Waste Reception hall, 6 nos 25m long In Vessel Composting (IVC) concrete tunnels, with technology provider from Europe, for the green wastes. Alongside which we built a new 4000m² Materials Re-cycling Facility (MRF) for the handling of dry re-cyclables. |
 |
Bidston IWMF
The project was for the design and construction of a 100,000 tonnes per annum Integrated Waste Management Facility (IWMF).The project includes a Household Waste Recycling Centre (HWRC) , Waste Transfer Hall (WTS), Materials Reclamation Facility(MRF) and in vessel composting( IVC) facility. |
 |
Norris Way HWRC, Birmingham
This contract required the re-build of a Household Waste Recycling centres whilst retaining public access and usage. The works comprised new reception hoppers, hardstanding, drainage and relocation of existing mechanical plant. |
 |
Green Waste Centre, Manchester
Construction of this plant involved ground remediation of existing infill site, the erection of the green waste building and the construction of a 10,000m² fibre concrete hardstanding and loading area. Additionally, car parking was created and the site access modified. |