Ferrybridge Power Station Flue Gas Desulpherisation (FGD)

North Midland Construction are providing civils works to facilitate the installation and operation Flue Gas Desulphurisation (FGD) plants at Fiddler’s Ferry  Power Station.  Fiddler’s Ferry Power Station is located close to Warrington, Cheshire, England. Three of the four existing coal fired boilers of 500 MWe each are to be equipped with an FGD according to limestone / gypsum process.


Fiddlers Ferry Power Station Flue Gas Desulpherisation (FGD)

North Midland Construction are providing civils works to facilitate the installation and operation of Flue Gas Desulphurisation (FGD) plants at Ferrybridge  Power Station.  Ferrybridge Power Station is located at Stranglands Lane, Knottingley; West Yorkshire, England. Two of the four existing coal fired boilers of 500 MWe each shall be equipped with an FGD according to limestone / gypsum process.




Kingsnorth Biomass Power

Renewable fuel (Biomass) feed system to fossil fuelled power station. The system will cater for a range of renewable fuel options being fed into the coal streams for combustion in the existing coal fired boilers. Plant and M & E work is the responsibility of NMC's sister company, Nomenca.

The project included the design and construction of:
   Bunkerage
   Silos
   Conveyors
   Fuel feed systems including M & E provision
   Fully integrated SCADA System.
   Dust suppression



Ironbridge Biomass Power

Renewable fuel (Biomass) feed system to fossil fuelled power station. The system will cater for a range of renewable fuel options being fed into the coal streams for combustion in the existing coal fired boilers. Plant and M & E work is the responsibility of NMC's sister company, Nomenca.

The project included the design and construction of:
   Bunkerage
   Silos
   Conveyors
   Fuel feed systems including M & E provision
   Fully integrated SCADA System.
   Dust suppression

 




FKearsley 132Kv GIS Substation

Design and Construction of an indoor gas insulated switchgear (GIS) building, associated infrastructure and external works to house the 15 bay double busbar GIS for UUE and 6 bay double busbar switchgear for NGC, and associated works.



Nechells West Substation

Commissioned by GPU Power this project required the rebuild of an existing 132Kv Substation to supply the power requirements to Network Rail's local infrastructure. Adjacent to the M6 at Gravelly Hill Interchange (Spaghetti Junction) the contract called for the complete construction and security measure requirements. The contract was completed at £616,000.



Thorpe & Trowse Substation, Norwich Plant

These two grid supply substations were constructed in inter-related phases to meet the clients total project requirement. The contract involved demolition of existing structures and construction of new bases, bunds and switchrooms. Both substations and ancillary works were constructed for £1,005,000.